TITLE: 02/25 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 72Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
- lost lock at the beginning of the shift due to commissioning
- I had to do an Initial Alignment
- I had to accept an exterordinary number of small differences in SDF, like 1e-17 differences, probably 10 total
- after H1 was in Observe, PI mode 28 rang up, damped with phase change, PI mode 27 also needed a phase change to settle down below 1
- useism is climbing