Displaying report 1-1 of 1.
Reports until 08:00, Monday 27 February 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:00, Monday 27 February 2017 (34428)
Ops Owl Shift Summary
Ops Shift Log: 02/26/2017, Owl Shift 08:00 – 16:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Locked at NLN, with 62.7 Mpc of range.  
Intent Bit: Observing
Support: N/A
Incoming Operator: Ed

Shift Summary: A2L DTT script shows Yaw is slightly elevated. No bad enough to warrant running the correction script. After several hours, the A2L Yaw has increased quite a bit and Pitch is elevated, as well. Should run the A2L script at first opportunity.

Other than the A2L, there were problems or issues this morning.  

Activity Log: Time - UTC (PT)
08:00 (00:00) Take over from Cheryl
15:05 (07:05) Apollo A/C contractor on site to see Bubba
15:55 (07:55) Bubba – Escorting Apollo to Mid-X for controls upgrade
16:00 (08:00) Turn over to Ed

 

 

Displaying report 1-1 of 1.