LHO General
filiberto.clara@LIGO.ORG - posted 08:23, Monday 16 July 2012 (3447)
PEM - Installation of Magnetometers, Microphone, Accelerometer
The following work was installed/powered last Friday:

End Y H2 Electronics Rack (Receiving area entering EY)
1. 2 Magnetometers and 2 filter units
2. 1 Microphone
3. 1 Accelerometer and 1 Endevco Unit
Two Kepco Power supplies were installed in the DCC Power Rack to power PEM units.

LVEA ITMY Racks (Between BSC8 and Y arm manifold):
1. 3 Magnetometers 
2. 3 Microphones
3. Accelerometers and 1 Endevco Unit