Displaying report 1-1 of 1.
Reports until 00:30, Thursday 02 March 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:30, Thursday 02 March 2017 (34522)
Ops Owl Shift Transition
Ops Shift Transition: 03/02/2017, Owl Shift 00:08 – 16:00 (00:00 - 08:00) - UTC (PT)
State of H1: IFO locked at NLN, at 29.8W and 54.3 Mpc  
Intent Bit: Observing
Weather: Wind is no more than a Light Breeze, Partly cloudy, lower 40s  
Primary 0.03 – 0.1Hz: Around 0.1um/s
Secondary 0.1 – 0.3Hz:  At 0.2um/s 
Quick Summary: Just back to Observing after PSL Lockloss. Been damping PI Modes 27 & 28.   
Outgoing Operator: TJ

 

Displaying report 1-1 of 1.