Starting CP3 fill. LLCV enabled. LLCV set to manual control. LLCV set to 50% open. Fill completed in 21 seconds. LLCV set back to 18.0% open. Starting CP4 fill. LLCV enabled. LLCV set to manual control. LLCV set to 70% open. Fill completed in 482 seconds. LLCV set back to 39.0% open.
Decreased CP3's liquid level control valve %open value to 17% down from 18%