cheryl.vorvick@LIGO.ORG - posted 08:04, Saturday 04 March 2017 (34574)
Ops Owl Shift Summary:
TITLE: 03/04 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC STATE of H1: Observing at 65Mpc INCOMING OPERATOR: Jeff SHIFT SUMMARY:
drop in PSL temperature, noise seen in H1
LVEA also had one verbal alarm about low building temperature