Displaying report 1-1 of 1.
Reports until 08:40, Saturday 04 March 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:40, Saturday 04 March 2017 (34575)
ops Day Shift Transition
Ops Shift Transition: 03/04/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) - UTC (PT)
State of H1: IFO locked at NLN, at 29.4W and 65.7 Mpc  
Intent Bit: Observing
Weather: Wind is up to a Light Breeze, Partly overcast, lower 40s  
Primary 0.03 – 0.1Hz: Around 0.1um/s
Secondary 0.1 – 0.3Hz: At 0.4um/s and trending upward 
Quick Summary: In Observing for 10.0 hours. No apparent problems or concerns   
Outgoing Operator: Cheryl
Displaying report 1-1 of 1.