Reports until 14:12, Tuesday 07 March 2017
LHO VE
kyle.ryan@LIGO.ORG - posted 14:12, Tuesday 07 March 2017 - last comment - 16:17, Tuesday 07 March 2017(34652)
Hammer-drilled anchor holes in LVEA floor
Kyle R., Gerardo M., Jeff B. 

Today we hammer-drilled (4) holes in the LVEA floor beneath CP2, (4) holes beneath CP1 and (2) holes beneath iLIGO RGA at NW corner of CP7.  Gerardo held in position a HEPA filtered vacuum at the hole site during the drilling to capture dust as it was being generated.  Following the drilling, the vacuum was left in position while a hand bulb was used to pump a jet of air into the bottom of the hole to liberate any remaining settled dust.  Jeff B. used a hand-held particle counter to monitor the operation at CP2.  At the next opportunity, I will use drop-in anchors to mount 1' lengths of unistrut to the floor.  These will provide a means to permanently mount 55 l/s ion pumps which will then connect to the vent/purge valves of CP1 and CP2.  These ion pumps will provide a means to pump hydrogen for those instances when CP1/CP2 need to be isolated for prolonged periods.  

This completes WP #6515
Comments related to this report
jeffrey.bartlett@LIGO.ORG - 16:17, Tuesday 07 March 2017 (34657)
  Due to Kyle & Gerardo's excellent drilling techniques particle counts were all under the Clean-100k standard for the LVEA. Counts were generally in the mid 10K particles.   
Images attached to this comment