Reports until 16:02, Tuesday 07 March 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:02, Tuesday 07 March 2017 (34655)
Ops Day Shift Summary
TITLE: 03/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 63Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Not a bad maintenance day. Ran initial alignment. Had multiple lock losses in FIND_IR while searching for the Y arm IR. Eventually made it past after sitting at LOCKING_ALS for some time. Kiwamu ran measurements at NLN before going to observing. I have been informed that tumbleweed bailing is ongoing on the X arm. The DMT viewer is not updating the range for LLO: https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=32104 I damped PI mode 28 (or it came back down on its own, not sure if I had any effect).
LOG:

Ken to end Y to install conduit
16:05 UTC Jim W. turning off sensor correction (SC_OFF_NOBRSXY)
16:11 UTC Richard connecting gig-e camera in CER
16:16 UTC Pest control on site, Chris escorting
16:30 UTC Evan G. using compressor in warehouse
16:32 UTC Chris taking pest control to mid and end Y
16:34 UTC Jeff B. starting WP 6510, looking for trapped air in PSL coolant lines
16:37 UTC Jason replacing ITMY optical lever, Richard to LVEA to possibly reboot the PSL enclosure Beckhoff environmental control
16:40 UTC Karen to LVEA
16:44 UTC Tumbleweed bailing to starti on Y arm
16:44 UTC Evan G. done
16:46 UTC Chris at end Y, reports Ken and Apollo there as well
16:48 UTC Jim W. to end Y to check centering of BRS T240, put insulation under table holding T240
16:56 UTC Travis and Evan G. to end Y to start PCAL calibration
16:57 UTC Chris escorting pest control to mid X
16:59 UTC Carlos rebooting nuc computers
17:00 UTC GRB. Maintenance already underway, LLO down.
17:01 UTC Gerardo to end Y to check on Y28 ion pump controller
17:06 UTC Richard out of LVEA
17:16 UTC Betsy turning off ITMY pitch optlev loop, lost lock
17:16 UTC Marc to vault power supply room
17:20 UTC Cintos? through gate (floor mat replacement)
17:27 UTC Kyle starting drilling, WP 6515
17:29 UTC Sheila to end Y, noise hunting
17:31 UTC Gerardo back
17:38 UTC Richard to LVEA
17:53 UTC Joe and Chris to LVEA, eyewash, forklift etc.
17:58 UTC Richard out of LVEA
18:05 UTC Richard to LVEA TCS tables to put tape over jumpers for safety estop
18:09 UTC Pest control done
18:30 UTC Chandra to mid Y
18:32 UTC Jeff and Peter out of LVEA
18:46 UTC Travis back. end Y is back to laser safe
18:46 UTC Jeff B. taking dust monitor to where Kyle is drilling
~18:57UTC  All status signals for h0vacey went into error and came back. Looks like connection to BPG gauges was lost temporarily. Later revealed to be Sheila powering down SUS rack electronics for noise hunting. ESD HV tripped and Sheila reset it.
19:03 UTC Jeff B. back
19:21 UTC Jason done
19:24 UTC Betsy starting charge measurements on both ETMs
19:25 UTC Ken done at end Y, going to mid X
19:26 UTC Marc back from vault power supply room (partway down x arm)
19:28 UTC Chandra back, going to LVEA to look at something
19:30 UTC Joe and Chris done in LVEA
19:35 UTC Richard and Betsy to LVEA to look at HWS table
19:42 UTC Filiberto back
19:44 UTC Betsy and Richard back
19:46 UTC Chandra back
19:47 UTC Kyle done in the LVEA
19:49 UTC Betsy transitioning LVEA to laser hazard
20:27 UTC Betsy done. LVEA back to laser safe.
20:30 UTC Charge measurements done
21:11 UTC Finished sweeping LVEA. Starting relocking
21:20 UTC X arm not staying locked on green, starting initial alignment
21:33 UTC Ken to end Y to install controller
21:47 UTC Initial alignment done
22:10 UTC Ken back, going to mid Y
23:01 UTC Kiwamu running measurement at NLN
23:14 UTC Back Observing. Tumbleweed bailing continues on X arm.
23:46 UTC Ken back