TITLE: 03/08 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 63Mpc
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: PSL AC briefly turned on. Richard and Peter were in the control room so they went in and fix it. The PSL temperature should slowly climb back to normal. Computers are on at EX and EY (can see this from the camera)
LOG:
14:00 Richard+Peter to PSL to check on the AC. The DIAG_MAIN notification just came on. Went out of Observe.
14:10 Richard+Peter out. Back to Observe. The range also went up.
14:57 Landscapers are here and headed to Xarm.
15:01 Chris towing forklift to MY.
15:03 Richard to LVEA to turn off the lights. Did not go out of Observe.
15:04 Richard back.
16:01 Karen to MX, Christina to MY.