Displaying report 1-1 of 1.
Reports until 08:11, Sunday 12 March 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:11, Sunday 12 March 2017 (34762)
Ops Day Shift Transition
Ops Shift Transition: 03/12/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: IFO locked at NLN, at 30.2W and 66.2 Mpc  
Intent Bit: Observing
Weather: Wind is Light Breeze, Overcast, Upper 40s  
Primary 0.03 – 0.1Hz: 0.01um/s 
Secondary 0.1 – 0.3Hz: At 0.3um/s
Quick Summary: In Observing for 5.5 hours. Observing conditions are good.   
Outgoing Operator: Nutsinee
Displaying report 1-1 of 1.