Reports until 08:22, Monday 13 March 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:22, Monday 13 March 2017 (34779)
Ops Day Shift Transition
 
Ops Shift Transition: 03/13/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: IFO locked at NLN, at 29.3W and 63.4 Mpc  
Intent Bit: Observing
Weather: Wind is up to a Gentle Breeze, Overcast, and Upper 40s  
Primary 0.03 – 0.1Hz: 0.01um/s 
Secondary 0.1 – 0.3Hz: At 0.2um/s
Quick Summary: In Observing for the past 8 hours. Observing conditions are good.   
Outgoing Operator: Jim