Reports until 13:38, Tuesday 14 March 2017
LHO VE
kyle.ryan@LIGO.ORG - posted 13:38, Tuesday 14 March 2017 (34812)
Installed drop-in anchors and bolted (4) ea. 1' lengths of UniSrut beneath CP1 and CP2 in the LVEA
Kyle, Chandra 

These will provide a means to mount 55 l/s ion pumps to the floor and eventually to connect these to the vent/purge valves of these two 80K pumps (once the ECR is approved, that is!)