WP 6511
In preparation for the installation of the new TCS HWS digital camera, 4 network cables were pulled in this morning. Cables run from the CER FAC-C1 rack to H1:SUS-R3 field rack (HAM4). The cables were landed as follows:
H1:FAC-C1 - GigE patch panel (U36, U35) on ports 53-56
H1:SUS-R3 - GigE patch panel (U42) on ports 5-8
Installed a patch panel with a RJ45 and 3W3 power connector on the east side of the TCS HSW enclosure.