TITLE: 03/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 66Mpc
INCOMING OPERATOR: Patrick
SHIFT SUMMARY:
- 16:00UTC - GRB
- 17:30UTC - lock loss
- 19:08UTC - Observe
- 22:50UTC - went out of Observe at Keita's request to turn on the TCSX SLED, a2l coherence was also high, so ran a2l script
- 22:57UTC - back in Observe
- no PIs have rung up