TITLE: 03/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 60Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Three lock losses my shift. The first I don't know the reason for. the second I couldn't get to PI in time, and the last the PSL went out (see alog34950). Seimic noise has been an issue for us today cause caused by trucks along Route 10 (see alog34944). Locked for 3hrs
LOG:
- 14:55 Bubba driving down arms to check tumble weeds.
- 15:18 Bubba back.
- 16:27 Noise was back for a few minutes.
- 17:05 Chris S to Yarm to start clearing some of the tumble weeds
- 17:14 Observing
- 17:21 Lock loss due to PI 27. I missed the initial ring up and then couldnt damp it in time.
- 18:02 At low noise, taking 10min for commissioning WP6529
- 18:30 Observing
- 18:32 Lockloss with PSL trip
- 18:33 Sheila starting OpLev measurement while we are down.
- 19:38 Observing
- 21:34 Handful of people of people going to the roof platform