Reports until 16:21, Tuesday 21 March 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:21, Tuesday 21 March 2017 (34985)
Ops Eveninf Shift Transition
Ops Shift Transition: 03/21/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: IFO locked at NLN, at 29.2W and 67.1 Mpc  
Intent Bit: Observing
Weather: Wind is a light Breeze, overcast, rain, and lower 50s  
Primary 0.03 – 0.1Hz: At 0.01um/s 
Secondary 0.1 – 0.3Hz At 0.1um/s
Quick Summary: Recovery after the maintenance window is complete. Observing for 1 hour.   
Outgoing Operator: TJ