Ops Shift Transition: 03/23/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: IFO locked at NLN, at 28.7W and 57.4 Mpc
Intent Bit: Commissioning
Weather: Wind is a Light Breeze, Clear and upper 50s
Primary 0.03 – 0.1Hz: At 0.01um/s
Secondary 0.1 – 0.3Hz: At 0.2um/s
Quick Summary: Todays commissioning work continuing until 01:00 (18:00)
Outgoing Operator: TJ