bubba.gateley@LIGO.ORG - posted 13:25, Monday 27 March 2017 (35113)
HVAC Controls Upgrade
Apollo is working at Mid-Y on the HVAC controls upgrade project. Both air handlers are down and will be for the night. This may cause a slight temperature rise in the building and may trigger some alarms. These are minor and only temporary.