Reports until 16:01, Tuesday 28 March 2017
H1 General
edmond.merilh@LIGO.ORG - posted 16:01, Tuesday 28 March 2017 (35129)
Shift Summary - Day

TITLE: 03/28 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY:

LOG:

15:06 Intention bit set to "Preventative Maintenance"

15:07 Peter and Jeff B to PSL enclosure

15:08 Fire Dept. on site smoke/heat testing

15:15 Hugh to EX

15:35 Travis to EX for PCAL work

15:50 Fil to EX for Interlock cabling.

15:53 Christina and Karen to out buildings

15:55 Gerardo to mid-stations

16:00 NORCO LN2 Y-ARM

16:13 Jeff B going to End Stations for FAMIS dust monitor checks

16:13 Hugh back from EX?

16:31 TJ doing Charge measurements on ETMY

16:34 More FD personell on site 

16:40 Taking FD to CER

16:43 NORCO LN2 X-ARM

16:45 More fire personnell on site

16:45 Betsy to LVEA for parts. HWS work is postponed.

17:04 Travis back from EX

17:05 Karen leaviong EY

17:09 Jeff B back

17:14 Carlos out to EX to retrieve HWS card

17:31 Bubba bringing FD into LVEA

17:44 Dick into LVEA - non invasive

17:44 Carlos reported back from EX

17:53 Fire testing in OSB is done

17:54 Hugh into CER

18:00 Bubba out of LVEA with FD

18:28 DAQ restart

18:38 Paradise Water on site for delivery

19:06 FIll back 

19:07 Bailing still going on

21:31 Betsy, Travis and TJ to MX

22:34 Lockloss - yet undetermined but possibly linked to some BRS issue that Hugh was doing. He and Jeff K are hashing it out.

22:41 Switched ISI_CONFIG back to NOBRSY and recovered ETMY ISI to resume.

22:49 TJ, Betsy, and Travis back

23:00 Handing of to Nutsinee