EricA & I today installed the Actuators in the HAM2 HEPI Housings. This paves the way for us to now Float the ISI on the HEPI Springs and set the elevation and level of the Optical Table. We could do that tomorrow and then be ready for IAS horizontal assessment and alignment correction.