Reports until 16:10, Thursday 19 July 2012
LHO General
travis.sadecki@LIGO.ORG - posted 16:10, Thursday 19 July 2012 (3514)
Staging building Quad 3 status

Although the metal build Quad 3 that is hanging in the staging building has been checked out and is ready to be put in storage, today I used it to test fit a new ECD magnet replacement block and check wire lengths.  So, currently it's M0 top mass is locked and the BOSEMS on the main chain tablecloth are detached.  We will be doing a couple more retrofits of parts (and possibly another round of testing to vet these retrofits) before we are ready to put it in storage.  STATUS: Q3 IS NOT SUSPENDED AND BOSEMS ARE DETACHED.