TITLE: 03/29 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: Most of the second half of shift was down due to earthquakes. Attempting to lock but not much luck so far. Maybe seismic is still a bit high.
LOG:
22:33 Balers done for the day.
04:18 Lockloss, there were couple of 5+ magnitudes eathquakes happened around the same time, but the seismic raised sharply to the roof implied something close by. The 6.6M earthquake in Russia was probably it.
00:00 Handling off to Patrick.