More MC2 Phase 2b testing

This afternoon, I:

- ran and committed to svn, TFs of all 6 DOFs of the glass MC2 chamberside, with the damping loops ON.

- performed svn commit on the exports I did of the 2012-07-20 TFs taken earlier of the all metal MC2, which also required renaming with arbitrary time as the form was incorrect for matlab.

- added all 3 sets of the latest data to the plotallhsts_tfs.m file and committed

Plot comparisons to come.