TITLE: 04/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Preventive Maintenance OUTGOING OPERATOR: Cheryl CURRENT ENVIRONMENT: Wind: 7mph Gusts, 6mph 5min avg Primary useism: 0.02 μm/s Secondary useism: 0.48 μm/s QUICK SUMMARY: Peter has transitioned the LVEA to laser safe. Chandra has closed the gate valves. IFO is down. IMC is set to OFFLINE. ISS second loop is off. ISI config is set to SC_OFF_NOBRSXY. Krishna is working at end Y. Filiberto is investigating PEM chassis in CER. Tumbleweed balers are on site. Rotorooter is here to backfill hole. Travis has started prep work for camera install. Ed and Jason are heading to end Y to swap optical lever laser.