Reports until 08:54, Tuesday 04 April 2017
LHO General
patrick.thomas@LIGO.ORG - posted 08:54, Tuesday 04 April 2017 (35307)
Ops Day Shift Transition
TITLE: 04/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: Cheryl
CURRENT ENVIRONMENT:
    Wind: 7mph Gusts, 6mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.48 μm/s 
QUICK SUMMARY:

Peter has transitioned the LVEA to laser safe. Chandra has closed the gate valves. IFO is down. IMC is set to OFFLINE. ISS second loop is off. ISI config is set to SC_OFF_NOBRSXY. Krishna is working at end Y. Filiberto is investigating PEM chassis in CER. Tumbleweed balers are on site. Rotorooter is here to backfill hole. Travis has started prep work for camera install. Ed and Jason are heading to end Y to swap optical lever laser.