Soft closed GV 5,7 at 15:25 UTC and re-opened at 19:00 UTC during viewport pcal camera installation. We let the accumulated gas load in gate annuli be burped in.
Took the opportunity to train a couple operators on stroking pneumatic valves: Jeff Bartlett and Nutsinee
Thanks to all for transitioning to laser safe for the installation.