filiberto.clara@LIGO.ORG - posted 13:06, Tuesday 04 April 2017 (35316)
H1 PEM AA Chassis
WP 6559
PEM group reported possible issues with some of the PEM "Test" channels in one of the AA chassis in the CER (PEM/OAF Rack slot U7 & U6). Channels 23-32 were all verified to be working.