TITLE: 04/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Preventive Maintenance INCOMING OPERATOR: Jim SHIFT SUMMARY: X arm is locked on IR. ALS is shuttered. ITMX optical lever damping is off. Travis said they would turn ITMX optical lever off. Input power is at 19.6 W. PCAL team is taking images of ITMX with this configuration. We are riding through the tail end of a 5.5 magnitude earthquake in Alaska. LOG: Apollo is at mid Y 15:00 UTC Took IFO down. Peter to LVEA to transition. 15:00 UTC Jeff to LVEA, measurements and dust monitors. 15:00 UTC Travis to LVEA. 15:00 UTC Krishna to end Y. Set to SC_OFF_NOBRSXY. 15:07 UTC Balers on X arm. Apollo and Chris back from end Y. 15:14 UTC Peter back. 15:27 UTC Filiberto looking at PEM chassis in CER. 15:30 UTC Rotorooter and LN2 through gate. 15:35 UTC Karen and Christina to end stations. 15:53 UTC Jason and Ed to end Y to swap optical lever laser. 15:58 UTC Pest control on site. 15:58 UTC Cintos through gate. 16:00 UTC Chandra back, gate valves closed. 16:01 UTC GRB. Ignored. 16:13 UTC Chris taking pest control to LVEA. 16:21 UTC Nutsinee to LVEA to work on HWS X camera install 16:24 UTC Chris taking pest control down Y arm. 16:28 UTC Apollo to end X mechanical room. Bubba to LVEA. 16:30 UTC Jeff B. done in LVEA. Heading to both end station VEAs for dust monitor maintenance. 16:37 UTC Dick G. to CER with signal analyzer to chase RF noise. 16:43 UTC Bubba back from LVEA. 16:44 UTC Chris and pest control moving from Y arm to X arm. 16:51 UTC Krishna done. 16:52 UTC Jason and Ed done. Restarted all nuc computers in CR per Carlo's request. 17:36 UTC Jeff B. done 17:40 UTC Filiberto done in CER. 17:44 UTC Karen leaving end Y. 18:01 UTC Karen to LVEA 18:22 UTC Jeff B. to LVEA to take pictures 18:27 UTC Tumbleweed baling in front of OSB 18:30 UTC Set ISI config to windy 18:34 UTC Pest control done on site 18:42 UTC TCS Y chiller flow is low verbal alarm 19:47 UTC Rick, Travis and crew out for lunch. 19:48 UTC Nutsinee out. Not completing remaining work (no laser hazard) 19:48 UTC Starting attempt to lock X arm on green 19:54 UTC Peter: PSL unshuttered. TCS back on. 20:12 UTC Dick G. done 20:40 UTC Rick, Travis, Carl to LVEA to take pictures with new ITMX camera 20:44 UTC Peter to join PCAL team at ITMX. 21:32 UTC Dave WP 6547 21:35 UTC Nutsinee to LVEA to take picture 21:56 UTC Nutsinee back 22:11 UTC X arm locked on IR 22:13 UTC PCAL crew to LVEA to take next set of pictures. Closed ALS shutters. Turned off optical lever damping on ITMX. Increased power to 19.5 W.