Reports until 10:15, Friday 19 November 2010
H2 INS
cheryl.vorvick@LIGO.ORG - posted 10:15, Friday 19 November 2010 - last comment - 11:25, Friday 19 November 2010(354)
BSC7 cleared of remaining items on the optics table, and temporary hardware removed:
- Zack, Rodney, Cheryl

Removed weights (140 lbs) and steering mirror from the optics table.  We then removed all of the auxiliary equip. used to remove large optics (lazy susan, lift table).

Final cleanup and storage of equipment will take place after Kyle and crew has put on the door.
Comments related to this report
cheryl.vorvick@LIGO.ORG - 11:23, Friday 19 November 2010 (355)
Earthquake Stops from H2 ITMX.  I see very little material loss at contact points.
Images attached to this comment
cheryl.vorvick@LIGO.ORG - 11:25, Friday 19 November 2010 (356)
Earthquake Stops on H2 FMX: all have viton tips, so images just show spacing.
Images attached to this comment