J. Kissel, A. Viets WP #6572 ECR E1700121 II 7828 Because I'm not sure how long it'll take to make the MED screens and fully commission the new parts' settings until we have results, I just want to get an aLOG in there that confirms we've installed the front-end infrastructure changes to begin tracking the SRC detuning as a function of time. This required modifying /opt/rtcds/userapps/release/cal/common/models/CAL_CS_MASTER.mdl to include many new EPICs records that store various DARM loop model component values at the already-existing PCAL line frequency (7.93 Hz), and as a bonus, I also installed all of the infrastructure to compute the SRC detuning frequency in the front-end as well -- it was an easy extension of the existing software to calculate the optical gain and cavity pole frequency, following the math in T1700106 and LHO aLOG 35105. I've installed values for these new EPICs records using svn up'd versions of /ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O2/H1/Scripts/CAL_EPICS/writeH1_CAL_EPICS.m /ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O2/Common/Scripts/CAL_EPICS/writeO2_TDEP_EPICS.m /ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O2/DARMmodel/Scripts/computeEPICS.m To do/aLOG: - Take screen shots of the new model infrstructure to show the implementation - Update TDEP MEDM overview screen to include the new math - Install demodulation parameters and lowpass filters for new 7.93 Hz demod - Install low-passes on F_S and Q_S output banks - Compare against GDS pipeline output