Displaying report 1-1 of 1.
Reports until 16:15, Tuesday 11 April 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:15, Tuesday 11 April 2017 (35483)
Ops Day Shift Summary
Ops Shift Log: 04/11/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN      
Intent Bit: Observing
Support: Jenne, Dave, Kissel
Incoming Operator: Travis
 
Shift Summary: After maintenance ran Initial Alignment. Had some trouble with ALS-Y during IA. Relocking took a few tries. IR DIFF required hand tuning several times. After this was resolved, locking went fine. Arrived at NLN. In Commissioning while Kissel wraps up.
Ran A2L test script. Pitch is at 0.6 and Yaw is at 0.55. Ran A2L while Kissel finished up.
Lost lock – There was a small earthquake around the time of Lockloss, but do not think this was the cause.
Relocked at the shift change.    

 

   Activity Log: Time - UTC (PT)
14:58 (07:58) Tumbleweed baling near End-X
15:00 (08:00) Take over from Nutsinee
15:00 (08:00) Peter – Transition LVEA to Laser Hazard
15:05 (08:05) Chris – Going into the LVEA routine equipment maintenance
15::06 (08:06) Cheryl, Richard, Marc – In the LVEA IMC alignment work (WP #6549)
15:15 (08:15) Rick, Heather, Vaishali – P-Cal work at End-X (WP #6569)
15:18 (08:18) Dick – In the CER
15:21 (08:21) Karen – End-Y cleaning
15:21 (08:21) Christina – End-X cleaning
15:25 (08:25) Nutsinee, Peter – HWS alignment
15:27 (08:27) Gerardo – Mid-Y
15:34 (08:34) Rick – End-X Laser Hazard   
15:34 (08:34) Bubba – Going into LVEA for 3IFO
15:40 (08:40) Norco – N2 delivery to Mid-X
15:52 (08:52) Filiberto – Terminating wiring in the PSL Air Handler closet  
16:05 (09:05) Chris – Finished in LVEA
16:05 (09:05) Chris – Going to End-Y
16:09 (09:09) Christina – Finished at End-X
16:09 (09:09) Christina – Going to Mid-X
16:10 (09:10) Jason – Swap Oplev laser at ITM-Y (WP #6565)
16:15 (09:15) Chandra – Vacuum work in LVEA & Mechanical room (WP #6566)
16:30 (09:30) Cheryl – Finished MC alignment work
16:32 (09:32) Chris – Finished at End-Y
16:33 (09:33) Chris – Going to End-X
16:37 (09:37) Norco – N2 delivery to End-X
16:40 (09:40) Karen – Finished at End-Y
16:45 (09:45) Greg & Co. – DMT work (WP #6567)
16:52 (09:52) Hugh – In Biergarten
16:55 (09:55) Cheryl, Richard, & Marc – Out of LVEA
17:00 (10:00) Rick, Heather, & Vaishali – Finished at End-X
17:34 (10:34) Hugh – Out of LVEA
17:35 (10:35) Kissel – Charge measurements on ETM-X
17:35 (10:35) Hugh – Going to both ends for HEPI checks  
17:40 (10:40) Robert – Going to End-X to check on channels
17:43 (10:43) Richard & Filiberto – Finished in the LVEA
17:44 (10:44) Filiberto – Going to End-Y for safety interlock wiring
17:50 (10:00) Jenne – Working L2A measurements (WP #6563)
17:58 (10:58) Paradise Water on site for delivery
18:02 (11:02) Carlos – Going to End-X to recover card for HWS
18:26 (11:26) Corey – Going to LVEA to check 3IFO N2 cabinet
18:35 (11:35) Chris – Going into the LVEA
18:36 (11:36) Keita – Going into the LVEA to check on HWS Camera install
18:38 (11:38) Chandra & Kyle – Finished in LVEA
18:39 (11:39) Carlos – Back from End-X
18:44 (11:44) Dave – DAQ restart
18:52 (11:52) Filiberto – Finished at End-Y
19:00 (12:00) Hugh – Back from end stations
19:02 (12:02) Jenne – Finished with L2A measurements
19:06 (12:06) Nutsinee, Peter, TJ – Finished with HWS camera install
19:06 (12:06) TJ – Swept the LVEA
19:07 (12:07) LVEA back to Laser Safe
21:06 (14:06) Relocked at NLN. In Commissioning for Kissel
21:15 (14:15) Damp PI Mode-28
21:36 (14:36) Finished running A2L script
21:38 (14:38) Back in Observing
22:03 (15:03) Lockloss –
22:05 (15:05) Reset the Noise Eater
23:00 (16:00) Turn over to Travis
23:02 (16:02) Relocked at NLN
23:06 (16:06) Back to Observing

 

Displaying report 1-1 of 1.