Displaying report 1-1 of 1.
Reports until 08:18, Friday 14 April 2017
H1 AOS
jeffrey.bartlett@LIGO.ORG - posted 08:18, Friday 14 April 2017 (35546)
Ops Day Shift Transition
Ops Shift Transition: 04/14/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: IFO locked at NLN, 27.2W and 66.1 Mpc  
Intent Bit: Observing
Weather: Wind is calm, partly cloudy, Temp in lower 40s  
Primary 0.03 – 0.1Hz: at 0.09um/s 
Secondary 0.1 – 0.3Hz: At 0.01um/s   
Quick Summary:  Locked and Observing for 20 hours. All appears normal at this time.     
Outgoing Operator: Jim

 

Displaying report 1-1 of 1.