TITLE: 04/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
Wind: 12mph Gusts, 8mph 5min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.13 μm/s
QUICK SUMMARY: all times UTC
- 15:06 - Robert used the last minutes of lock to inject at HAM6
- 15:11 - Chris to LVEA
- 15:30:
- Nutsinee to TCSX for HWS alignment,
- Travis to EX for Pcal calibration
- John, site survey
- Gerardo to EY, then EX, then MY, vaccum
- Jason, PMC realign
- Fil, cable pulling in LVEA, on hold due to TCSX work, requires HAM3, HAM4, and HAM5 external access, and would trip ISIs
- 15:45 - Norco #1 to EY
- 15:57 - Christine and Karen to EX and EY
- 16:00 - Norco #2 to CP2