Completed WP 6579 and then some.
- Ran Kobelco purge air unit (DP measured -43.7degC)
- Ran QDP80 (#2) roughing pump
- Spun up turbos on X & Y beam manifolds successfully & swapped out battery packs on both
*left three turbo stations and Kobelco energized, water still valved into QDP80 (#2) for cooling
Follow-up maintenance items:
- QDP80 (#1) needs oil before vent
- Green indicator light on QDP80 (#2) pump is burned out
I de-energized Kobelco and valved out water to QDP80. Tomorrow during commissioning I will enter LVEA and de-energize turbo stations.