We'll have a brief commissioning break from 9AM to 1PM Pacific tomorrow, coincident with LLO.
Task list (will be down selected):
- Continue OMC jitter coupling measurement.
- Use laser vibrometer to measure baffle vibration.
- Walk the beam in PRC to find a better spot for baffle scattering.
- Investigate dust blip in HAM6 (low priority).
Measure ASC sensing matrix, including POP WFS. (Should be quick - amplitudes all tuned already)