TITLE: 04/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: Not much activities after I took over from Cheryl. Locked at NLN briefly but lost it. Possibly due to wind (now passed 30 mph).
LOG:
19:30 Robert & Evan to End Stations -- turn off PCal camera.
20:20 Fil & Marc out (cable pulling work)
20:36 Robert & Evan back
20:53 Robert to LVEA -- align MC3 camera
20:54 Dave back
21:01 Jenne et al. to ISCT1 to place beam dump.
22:14 Robert done sweeping the LVEA
I attached all the SDFs I accepted and reverted today. Non of these have been committed to the svn yet.