Reports until 10:57, Thursday 27 April 2017
H1 General (DetChar)
kentaro.mogushi@LIGO.ORG - posted 10:57, Thursday 27 April 2017 (35831)
DQ Shift: Monday 24th 00:00 UTC - Wednesday 26th 23:59 UTC
The full report can be found on the detchar wiki: https://wiki.ligo.org/DetChar/DataQuality/DQShiftLHO20170424

Below I summarize the main highlights of this shift:

-The duty cycle was 64.3%. The range was around 65Mpc but it reduced by about 5Mpc mainly due to seismic noise
-The out of observing due to the calibration pipeline problem from 6:42 to 11:24UTC on Monday see more details
-There were the fundamental violin mode seen druing 1:30 - 4:30UTC on Tuesday and during 2:30 - 9:00UTC on Wednesday.
-The Commisioning started at 16:10UTC on Wednesday for ASC measurements and OMC jitter
-30Hz blob of glitches has been showing up but after disconnecting the EY Oplev fiber, we have not observed any glitching around the 30 Hz region.The coupling to h(t) might be caused by the changing radiation pressure as the OpLev mode hops
-50Hz glitche still persists and remains mysterious.