TITLE: 04/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 56Mpc
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY: Started rough after EX sei crash, but running smooth now
LOG:
The big event was the recovery after the EX seismic front end crashed (see Jeff and Dave's logs for details). Otherwise a few people went to the mid stations today, but we were a little distracted with recovery.