Displaying report 1-1 of 1.
Reports until 00:22, Monday 01 May 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:22, Monday 01 May 2017 (35927)
Ops Owl Shift Transition
Ops Shift Transition: 05/01/2017, Owl Shift 07:00 – 15:00 (00:00 - 08:00) - UTC (PT)
State of H1: IFO locked at NLN, 30.9W and 62.3 Mpc  
Intent Bit: Observing
Weather: Wind is up to a Moderate Breeze, clear, temps upper 40s  
Primary 0.03 – 0.1Hz: X Axis around 0.03um/s, Y & Z Axis at 0.01um/s 
Secondary 0.1 – 0.3Hz: At 0.1um/s   
Quick Summary:  Locked for 54.75 hours. A2L Pitch below reference, Yaw is slightly elevated.      
Outgoing Operator: Nutsinee

 

Displaying report 1-1 of 1.