Displaying report 1-1 of 1.
Reports until 00:11, Tuesday 02 May 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:11, Tuesday 02 May 2017 (35958)
Ops Owl Shift Transition
Ops Shift Transition: 05/02/2017, Owl Shift 07:00 – 15:00 (00:00 - 08:00) - UTC (PT)
State of H1: IFO locked at NLN, 30.7W and 67.8Mpc  
Intent Bit: Observing
Weather: Wind is a Gentle Breeze, clear, temps lower 50s  
Primary 0.03 – 0.1Hz: Y Axis around 0.03um/s, X & Z Axis at 0.01um/s 
Secondary 0.1 – 0.3Hz: At 0.06um/s   
Quick Summary:  Locked for 3 hours. A2L Pitch is OK, Yaw is slightly elevated.
Outgoing Operator: TJ
Displaying report 1-1 of 1.