Reports until 08:08, Tuesday 02 May 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:08, Tuesday 02 May 2017 (35961)
Ops Owl Shift Summary
Ops Shift Log: 05/02/2017, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Locked at NLN 30.7W and 69.1Mpc of range      
Intent Bit: Observing
Support: N/A
Incoming Operator: Travis
 
Shift Summary: Run A2L check script. Pitch is rung up to 0.9 around 30Hz; Yaw is below the reference. If LLO drops out of Observing, will run the A2L repair script.
LLO down for tour; dropping out of to run the A2L repair script. Back into Observing. Both Pitch and Yaw are well below reference.
Mag5.1 EQ South of Tonga – No apparent effect on the IFO
Good shift for data taking.
 
     Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from TJ
14:14 (07:15) Drop out of Observing to run A2L repair script
14:26 (07:26) Back into Observing
14:53 (07:53) Mag5.1 EQ South of Tonga
15:00 (08:00) Turn over to Travis