Displaying report 1-1 of 1.
Reports until 08:21, Saturday 06 May 2017
LHO General
thomas.shaffer@LIGO.ORG - posted 08:21, Saturday 06 May 2017 (36063)
Ops Day Shift Transition

TITLE: 05/06 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 65Mpc
OUTGOING OPERATOR: Cheryl
CURRENT ENVIRONMENT:
    Wind: 7mph Gusts, 5mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.12 μm/s
QUICK SUMMARY: Locked for 4.5hrs with calm environment. DIAG_MAIN is reporting that the IM1/2 Yaw is out of norm, Cheryl gave me some values to put in if we lose lock.

 

Displaying report 1-1 of 1.