TITLE: 05/08 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY:
PSL recovery & a little tough to get locked (but not that bad). Rest of the shift was normal running. H1 was then promptly taken down at the end of the shift & I handed off "May Vent" tasks to Nutsinee. I covered the Ops Station briefly while Nutsinee shuttered PSL pipes and she locked out the TCS lasers. Now she is taking over Ops.
It's looking like I wrote over my Transition alog here (hence the subentries attached to this).....a sleep-deprived mistake. :-/
LOG:
Broke lock at LOWNOISE_ESD_ETMY! :(
Just A Note: PRMI_2_DRMI_TRANSITION hasn't worked for me the last two times I've tried. (DRMI did lock up last time.)