Reports until 19:50, Tuesday 09 May 2017
chandra.romel@LIGO.ORG -
posted 19:50, Tuesday 09 May 2017 - (36114)
Vacuum summary (vertex vent)
- IP6 is actually powered ON even though it appears red on MEDM. It's currently on the new style power supply.
- John and I experimented with x-beam manifold pressure by toggling valves on main turbo and IP6.
- Left the x-beam manifold turbo pump ON but valved out of main volume - will resume leak checking tomorrow while we pump down vertex.
- Will start pump down Wed. morning. Left purge air ON overnight with flow into volume at one vent valve and the KF cap off of the other vent valve to dry out the volume.
- Doors were off for 9 hours today.