Displaying report 1-1 of 1.
Reports until 15:58, Wednesday 10 May 2017
LHO General
patrick.thomas@LIGO.ORG - posted 15:58, Wednesday 10 May 2017 (36128)
Ops Day Shift Summary
TITLE: 05/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Pump down of chambers has begun.

LOG:

15:05 UTC Amber leading tour in control room
15:20 UTC Tour leaving control room
15:20 UTC Jeff B. to LVEA and cleaning area, survey for plumbing work
15:32 UTC Gerardo to CER mezzanine to check on HV, and to LVEA
15:46 UTC Jeff B. out
15:57 UTC WP from Chandra to begin pumping
16:00 UTC Travis to beer garden to clean up equipment
16:18 UTC Apollo at end Y, shutting down HVAC for FMCS upgrade
16:18 UTC Kyle to mid X and end X looking for cable
16:30 UTC Apollo through gate
16:37 UTC Kyle back
16:45 UTC Travis done (from email)
16:46 UTC Filiberto and Richard to LVEA tables to document serial numbers of photodiodes
16:47 UTC Karen to VPW and then staging building
17:39 UTC Filiberto and Richard done. Heading to end stations.
17:46 UTC Amber leading tour through control room
17:49 UTC Mike taking guest into LVEA
18:17 UTC Mike and guest out of LVEA
18:21 UTC Hugh had me set CS HEPI pumpcontroller setpoint to 0
18:17 UTC Roughing pumps have been started
18:28 UTC Richard and Filiberto back
19:22 UTC Gerardo, Kyle and Chandra out for lunch
19:37 UTC Hugh had me set CS HEPI pumpcontroller setpoint to 70
19:45 UTC Hugh done in CS
20:24 UTC Aidan and Nutsinee to LVEA to start rebuilding TCS table
20:37 UTC Jim and Hugh to end stations for HEPI accumlators and pump station maitenance
21:05 UTC Gerardo to LVEA to pick up equipment
21:06 UTC Marc to mid Y to pick up parts
21:08 UTC Filiberto to LVEA to help TCS crew reconnect cable
21:19 UTC Hugh at end Y
22:00 UTC Site Weekly meeting
22:54 UTC Hugh to LVEA
Displaying report 1-1 of 1.