TITLE: 05/11 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering INCOMING OPERATOR: None SHIFT SUMMARY: Vacuum pumping of the vertex was resumed this morning. Chandra and Kyle are currently leak testing GV7 (WP 6636). Aidan and TJ worked on the HWS table. They are currently waiting for Chandra and Kyle to finish before resuming. (WP 6629) The LVEA was switched from laser safe to laser hazard and back to laser safe. The FMCS channels at end Y are no longer valid as a result of the FMCS upgrade. Jeff, Jason and Peter worked in the PSL enclosure to clean up routing of cables and plumbing (WP 6628). The fire department was on site and tested audible alarms. There is a timing error at end Y. Filiberto has pulled the RF oscillator source for troubleshooting. LOG: 14:56 UTC Marc -> mid Y (parts) end Y (timing system) 15:17 UTC Gerardo to LVEA to start pumps 15:19 UTC Apollo at end Y (as reported by Richard) 15:41 UTC Filiberto to end Y 15:45 UTC Richard to end Y 15:55 UTC Jeff to PSL enclosure (cable untangling) 16:09 UTC Filiberto and Richard back. Powercycled timing VCO chassis. Timing is back. 16:13 UTC TJ transitioning LVEA to laser hazard 16:17 UTC TJ done. Aidan to LVEA to start work on TCS table 16:24 UTC Marc back 16:24 UTC Jason to join Jeff and Peter in PSL enclosure 16:28 UTC Chris retrieving helium bottle from BSC7 16:36 UTC I went into the server room and plugged in the power for PSL enclosure phone per Peter's request. 16:43 UTC Fire department through gate, turning around to go to LSB 16:45 UTC Karen to LVEA and optics lab to clean 16:49 UTC Filiberto back from cabling hartmann table 16:51 UTC Christine to LVEA to clean 17:02 UTC Gerardo checking on turbo pump 17:05 UTC Filiberto to end Y 24 Mhz OCXO 17:10 UTC Hanford testing fire panel 17:14 UTC Gerardo back 17:43 UTC TJ and Aidan back from HWS table 17:44 UTC Hugh to end stations looking for serial numbers 17:55 UTC Gerardo back to LVEA to check on turbo pump 18:01 UTC TJ to PSL chiller to fill when instructed by Jason 18:10 UTC Filiberto back 18:17 UTC TJ done 18:19 UTC Aidan and TJ back to table 18:26 UTC Mike taking guest on tour in LVEA 18:27 UTC Karen out of LVEA, to mid Y 18:48 UTC Jeff B. out of PSL enclosre, Peter and Jason taking power measurements 18:54 UTC Mike and guest out of LVEA 19:02 UTC Karen leaving mid Y 19:21 UTC Peter and Jason done 19:29 UTC Kyle to mid Y 19:30 UTC Hugh back from outbuildings 19:46 UTC Filiberto to end Y (timing) 19:51 UTC Kyle back 20:16 UTC Betsy to take transfer functions of SUS 20:24 UTC Aidan and TJ back 20:33 UTC Hugh to LVEA, getting serial numbers off equipment on BSC1, HAM6, climbing around chambers 20:41 UTC Betsy running transfer functions on ITMX 21:22 UTC Hugh done on BSC1 21:44 UTC Hugh done 21:55 UTC TJ transitioning LVEA to laser safe for Chandra to climb on gate valve for leak testing. 22:12 UTC TJ done 22:41 UTC Fire department done 22:46 UTC Cheryl to optics lab Peter powered phone for PSL enclosure back off 22:59 UTC Cheryl back 23:03 UTC Marc to LVEA to photograph gatevalve leak testing 23:10 UTC Apollo leaving for the day