HAM4 Annulus system was valved off at 23:45 utc, aux cart remains connected and running.
BSC3 Annulus system was valved off at 23:50 utc, aux cart remains connected and running.
If pressure maintains for both systems the vacuum aux hardware will be removed tomorrow.