robert.schofield@LIGO.ORG - posted 19:43, Tuesday 09 May 2017 - last comment - 10:23, Monday 15 May 2017(36113)
Swiss Cheese Baffle Damping Complete

Damping completed and flanges back on. No hitches. Three viton corks are in, preliminary laser vibrometry looks good. More later.

Gerardo, Vinny, Robert

Comments related to this report
keita.kawabe@LIGO.ORG - 13:33, Thursday 11 May 2017 (36137)

First picture: Robert looking through the viewport at 9 o'clock position while inserting his hand into lower viewport hole at 8:00 position.

Second picture: A view through the lower viewport hole at 8:00 position. Black viton cork is inserted between the rib of the baffle and the chamber wall.

Images attached to this comment
stephen.appert@LIGO.ORG - 08:36, Friday 12 May 2017 (36153)
Pointer to the follow-up log entry: https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=36147
robert.schofield@LIGO.ORG - 10:23, Monday 15 May 2017 (36186)

Just to avoid any future confusion, the pictured location of the cork just above was not the final position. Based on feedback from the laser vibrometer, I moved it to 7:00, as pictured in the follow-up link given by Stephen.