TITLE: 05/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering INCOMING OPERATOR: None SHIFT SUMMARY: Pump down of vertex continues. Aidan, Nutsinee and TJ working on HWS table. Removed panel to enlarge beam apertures. Robert and Pep working at end Y. Lost connection to weather stations and dust monitors as part of their work. Apollo working on FMCS upgrade at end Y. Betsy running transfer functions on ITMX. LVEA is laser hazard. LOG: 15:21 UTC Betsy running transfer functions on ITMX 15:50 UTC Betsy, Calum and Nicole to mid Y then mid X 15:57 UTC TJ transitioning LVEA to laser HAZARD 16:05 UTC TJ done 16:07 UTC TJ and Aidan to HWS table 16:11 UTC Christina to mid X 16:18 UTC Gerardo taking viewport equipment to LVEA 16:25 UTC Nutsinee to HWS table 17:03 UTC Aidan, TJ and Nutsinee back. Brought HWS table panel out to have Bubba enlarge the beam apertures. 17:43 UTC Richard to LVEA to check functioning of Beckhoff laser safety interlock on table 17:47 UTC Richard back 18:25 UTC Jeff B. opening rollup door between cleaning area and receiving 18:30 UTC TJ to squeezer bay 18:37 UTC TJ back 18:38 UTC Jeff B. done 19:23 UTC Pep and Robert working at end Y, turned wifi on 20:11 UTC Chandra to LVEA to check on annulus 20:20 UTC Jeff B. to cleaning area 21:12 UTC Bubba to LVEA to turn off cleanrooms 21:23 UTC Jeff B. done 21:30 UTC TJ to cleaning area 21:36 UTC Mike and guest to LVEA 21:37 UTC Nutsinee working with TJ in cleaning area 21:42 UTC Aidan to cleaning area to work with TJ and Nutsinee 22:03 UTC Mike and guest out of LVEA 22:04 UTC Robert and Pep to end Y 22:51 UTC Robert and Pep back 22:57 UTC Nutsinee back