patrick.thomas@LIGO.ORG - posted 16:09, Friday 12 May 2017 (36170)
Ops Day Shift Summary
TITLE: 05/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Pump down of vertex continues.
Aidan, Nutsinee and TJ working on HWS table. Removed panel to enlarge beam apertures.
Robert and Pep working at end Y. Lost connection to weather stations and dust monitors as part of their work.
Apollo working on FMCS upgrade at end Y.
Betsy running transfer functions on ITMX.
LVEA is laser hazard.

LOG:

15:21 UTC Betsy running transfer functions on ITMX
15:50 UTC Betsy, Calum and Nicole to mid Y then mid X
15:57 UTC TJ transitioning LVEA to laser HAZARD
16:05 UTC TJ done
16:07 UTC TJ and Aidan to HWS table
16:11 UTC Christina to mid X
16:18 UTC Gerardo taking viewport equipment to LVEA
16:25 UTC Nutsinee to HWS table
17:03 UTC Aidan, TJ and Nutsinee back. Brought HWS table panel out to have Bubba enlarge the beam apertures.
17:43 UTC Richard to LVEA to check functioning of Beckhoff laser safety interlock on table
17:47 UTC Richard back
18:25 UTC Jeff B. opening rollup door between cleaning area and receiving
18:30 UTC TJ to squeezer bay
18:37 UTC TJ back
18:38 UTC Jeff B. done
19:23 UTC Pep and Robert working at end Y, turned wifi on
20:11 UTC Chandra to LVEA to check on annulus
20:20 UTC Jeff B. to cleaning area
21:12 UTC Bubba to LVEA to turn off cleanrooms
21:23 UTC Jeff B. done
21:30 UTC TJ to cleaning area
21:36 UTC Mike and guest to LVEA
21:37 UTC Nutsinee working with TJ in cleaning area
21:42 UTC Aidan to cleaning area to work with TJ and Nutsinee
22:03 UTC Mike and guest out of LVEA
22:04 UTC Robert and Pep to end Y
22:51 UTC Robert and Pep back
22:57 UTC Nutsinee back