Reports until 08:05, Monday 15 May 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:05, Monday 15 May 2017 (36180)
Ops Day Shift Transition
Ops Shift Transition: 05/15/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: IFO unlocked    
Intent Bit: Engineering
Weather: Wind is Calm; Skies are clear; Temps in the mid 30s  
Primary 0.03 – 0.1Hz: At 0.5um/s 
Secondary 0.1 – 0.3Hz: At 0.1um/s   
Quick Summary: IFO unlocked for continued pumping after vent. Primary microseism ringing down from earlier earthquake.  
Outgoing Operator: N/A